03 / AIRFRAME & ASSEMBLYA little assembly.
A lot to look forward to.
Install the wing, struts, tail surfaces, and landing gear using the quick-start instructions. The airframe combines lightweight EPP foam with polypropylene (PP) board and ABS plastic components, finished with screen-printed graphics and stickers.
Plan for approximately 30 minutes of assembly time. Allow additional time for adhesive to fully cure before flying.
EPP, PP & ABS construction Screen-printed graphics & stickers Fixed wire landing gear